The Dreamliner Becomes a Nightmare How could a really great company get so many things wrong? Jim Smith Ph.D. ABD February 12, 2013 Did cost-cutting strategy jeopardize the production of what should have been an engineering triumph? Read More
Boeing Finishes ‘Surge Line’ June 14, 2012 EVERETT, WA—Boeing has completed construction of a temporary additional 787 assembly line here—known as the “surge line”—but won’t build new Dreamliners on it until the fall. Read More